Understand which report your project needs — from early feasibility and consent through design, earthworks and completion.

Explore report types ↓
THE REPORT GUIDE

THE RIGHT REPORT.
AT THE RIGHT STAGE.

Different project stages call for different geotechnical documents. Explore the common report categories in Auckland Council’s earthworks and geotechnical framework.
Requirements vary by project risk, scope and consent conditions. Not every project needs every report, and some reports can be combined.

01 / PLANNINGCoP §2.9.5
GAR

Geotechnical Appraisal Report

Early planning and feasibility

Identifies ground hazards, development constraints and further investigation needs.

02 / PLANNINGCoP §2.9.8
GER

Geotechnical Effects Report

Resource consent and neighbouring effects

Assesses potential effects of excavation, groundwater drawdown and settlement on neighbouring properties and assets.

03 / DESIGNCoP §2.9.6
GFR

Geotechnical Factual Report

Following ground investigation

Presents factual borehole, CPT and laboratory results, separately from engineering interpretation.

04 / DESIGNCoP §2.9.7
GIR

Geotechnical Interpretative Report

Ground model and consent

Interprets site geology, geotechnical hazards and implications for proposed development.

05 / DESIGNCoP §2.9.10
GDR

Geotechnical Design Report

Detailed engineering design

Records ground parameters, design assumptions, calculations and recommendations for the proposed works.

06 / CONSTRUCTIONCoP §2.9.9
GSMCP

Groundwater & Settlement Monitoring and Contingency Plan

Before sensitive construction

Defines monitoring locations, alert levels, monitoring programme and contingency measures.

07 / CONSTRUCTIONCoP §2.9.12
GMR

Geotechnical Monitoring Report

During and after construction

Reviews measured ground movements or groundwater changes against project monitoring criteria.

08 / CONSTRUCTIONPROJECT-SPECIFIC
GDSM

Groundwater Drawdown & Settlement Monitoring Report

During dewatering, excavation and post-construction monitoring

Documents groundwater level changes, drawdown trends and measured settlement; compares results with project-specific alert and action levels, identifies exceedances and records monitoring recommendations.

09 / COMPLETIONCoP §2.9.11
GCR

Geotechnical Completion Report

After earthworks / subdivision

Documents completed earthworks, verification, as-built records and lot-specific recommendations.

10 / COMPLETIONCoP §2.9.13
SGR

Supplementary Geotechnical Report

When project conditions change

Updates earlier reports when new ground information, design changes or lot requirements arise.

PROJECT JOURNEY

FROM EARLY ADVICE
TO FINAL SIGN-OFF.

Reporting evolves as the project moves from understanding ground conditions to verifying completed earthworks.

01Feasibility & consentAppraisal, interpretation and effects assessment
02Investigation & designFactual records, ground model and engineering design
03Construction & monitoringMonitoring, observations and response to ground conditions
04Completion & certificationCompletion reports and relevant supporting statements
AUCKLAND COUNCIL FRAMEWORK

ENGINEERING REPORTS.
CLEAR PURPOSE.

These categories follow the Auckland Council Code of Practice for Land Development and Subdivision, Chapter 2: Earthworks and Geotechnical, Section 2.9 and Table 4 (Version 2.0, May 2023). The Code has a defined scope; the exact documents required for any development depend on its applicable consent conditions and risk.

Earthworks specifications, geotechnical drawings and Producer Statements (PS1, PS2, PS4) may accompany the relevant reports but are not interchangeable report types.

View official Auckland Council Code of Practice ↗